Wuxi Xianglong Plastic Technology Co.,Ltd is one of the leading China evaporative closed cooling tower fill manufacturers, welcome to wholesale cheap cooling tower fill types from our factory.
Quick Details-
Condition: New
-
Cooling Type: Cross Flow
-
Material: PVC, PP,UPVC, pvc, pp, upvc
-
Place of Origin: Hebei, China (Mainland)
-
Brand Name: SINTA
-
Model Number: ST-01
-
Dimension(L*W*H): 1330mm*any length
-
Warranty: within 1 year
-
After-sales Service Provided: Overseas service center available
-
Item name: Evaporative closed cooling tower fill
-
type: cross-flow cooling tower fill
-
application: BAC fill for bac cooling tower
-
Fill size: 1330mm*any length
-
Fill Thickness: 0.35mm-0.55mm
-
Color: black
-
Application temperature: 75℃~-35℃
-
Packaging: by crate or as per customer's request
-
Sample: can be supplied freely
Packaging Details: | BAC cooling tower fill is packed by wooden case |
---|---|
Delivery Detail: | within 15 days after receiving the deposit |
1300mm*any lenth Evaporative closed BAC cooling tower fill
Product Description
BAC Cooling Tower fill Features
-100% Virgin PVC material
-Good elastic character
-Improved water distribution
-High thermal performance
BAC Cooling Tower fill Introduction
BAC cooling Tower Fill is one of the most important components for exchange of gas and water in cooling tower. It is the major parts to improve the efficiency of cooling tower and make sure the economy and safe operation. With the development of the plastic industry, counter-current tower drench water plastic packing "S" shape ladder wave, obliquely wave, which has the heat dissipation ,good performance ,Ventilated small resistance, durable, based on the easy and other advantages, it is widely used in different types of large, medium, small, cooling tower.
BAC Cooling Tower fill Specification
Name |
BAC Cooling Tower Fill sheet |
Type |
Cross flow cooling tower fill |
Material |
PVC, PP, UPVC |
Size |
1330mm*any length |
Thickness |
0.35mm-0.45mm |
Application Temperature |
-35℃- 75℃ |
Color |
Black, grey, etc |
Packaging Detail |
BAC fill sheets are packed by wooden case |
MOQ |
500 pieces |
Delivery period |
Within 15 days after receiving the deposit |
More photos of BAC cooling tower fill
Packaging & Shipping
MOQ |
500 pieces |
Packaging Detail |
BAC fill sheets are packed by wooden case |
Delivery period |
Within 15 days after receiving the deposit |
Advantage
Our company cooling tower have advantage as below
1.New material
2.large plastic extrusion
3.long service life
4. high temperature resistant
5. Good heat exchange perfomance, and excellent Cooling efficiency
Other hot sales